PLANNED ENVIRONMENTAL PROJECTS

 

PORTABLE WATER TREATMENT PLANT – WATER SUPPLY FOR MUNICIPALITY OF VRBAS

Water supply project in the Municipality of Vrbas encompasses: 

  1. expansion of the existing deep wells in Vrbas 
  2. building of Portable Water Treatment Plant with capacity of Q=250 l/s, 
  3. reconstruction and upgrade of existing distribution system in Vrbas, and 
  4. building distribution network from the Portable Water Treatment Plant to the settlements in the Municipality of Vrbas.

It has been envisaged to get the water from the “first aquifer” at the depth of approximately 60 m. Water contains higher levels of iron (Fe), manganese (Mn) and ammonia (NH4).

In the purification process will be applied the following operations pre-ozonation, filtration, GAC filtration and disinfection.

 

CENTRAL WASTE WATER TREATMENT PLANT OF VRBAS AND KULA
(CWWTP of Vrbas and Kula)

Within the Revitalisation of Veliki bački kanal (The Great Canal of Bačka) Project, it is of essential significance to build Central waste water treatment plant - CWWTP of Vrbas and Kula. CWWTP will treat waste water from Vrbas, Kula and five other settlements in the Municipality of Vrbas, as well as previously treated industrial waste water.

CWWTP is located on the south of Vrbas, in the vicinity of the “triangle” on the Bogojevo – Bečej canal. Capacity of the CWWTP will be 120.000 PE (person equivalent).

At the CWWTP will be applied the Biological Nitrogen Phosphorus Removal in a conventional activated sludge system, thus meeting all requirements stipulated by the EU Water Framework Directive.